Facilities

Research & Development
Quality Assurance & Quality Control
The Quality Assurance (Q/A) team plays a crucial role in ensuring the effective implementation of the quality management system. This team actively monitors the system’s efficacy, which is founded on the ISO 9001:2015 standard and encompasses all pertinent elements as specified by the ICH Q7 standard.
The Quality Control department is equipped with state-of-the-art analytical instruments and staffed by proficient analysts. This department is responsible for generating essential analytical data pertaining to various quality-related aspects, including routine analysis, investigations, validations, method development, and compliance with guidelines such as ICH etc.


Quality Control Major Instruments
- HPLCs
- GCs
- UV-vis Spectrophotometer
- Melting point apparatus
- Analytical Balance
- pH Meter
- Vacuum Oven
- UV Cabinet
- Muffle Furnace
- K.F. Apparatus
- Hot plate
- Hot air Ovens
Manufacturing Facility
- Production Block
- Hydrogenation Block
- Admin Block
- Warehouse
- Under Ground Storage Tanks
- Drum Shed
- Utility Area
- QC & QA
- Boiler House
- DG set & PCC Room
- 420 KVA Yard
- ETP


Manufacturing Equipment – Capacities
Equipment | Moc | Capacity (Min. – Max.) |
---|---|---|
Reactors | SS-316 | 0.12KL – 8.0KL |
Reactors | GLR | 0.25KL - 8.0KL |
Hydrogenators | SS-316 | 2.0KL - 3.0KL |
High Vacuum Distillation | SS-316 | 1.0KL - 3.0KL |
ANFDs | SS-316 | 5.0KL |
GL ANFD | GL | 2.5KL |
Cryogenic Reactors | SS-316 | 3.0KL – 4.0KL |
Centrifuges | SS-316 | 24 Inch - 48 Inch |
Tray Dryers | SS-316 | 48 Trays – 96 Trays |
VTD | SS-316 | 6 Trays |
RCVD | SS-316 | 1.0KL |
PNF/NF | SS-316 | 0.5KL - 1.0KL |
Leaf filters | SS-316 | 100 Lit |
Multi Mill | SS-316 | 250 Kg/Hr |
Blenders | SS-316 | 1.0KL |
Sifters | SS-316 | 60 Inch |
Key Utilities – Capacities
- High Vacuum System up to 0.1 Torr
- High Temperature up to 280 °C
- Nitrogen Plant 50 nm3
- RO System for Water Purification 5 m3/hr
- Dedicated Drying and Packaging Areas
- Under-ground Storage Tanks 6×30 KL
- 30 TR Chilling Plant of -20 °C
- 82 TR Chilling Plant of -20 °C
- 76 TR Chilling Plant of +5 °C
- 200 TR Cooling Tower
- 50 TR Cooling Tower
- 2.0 TPH Coal fired Boiler
- 420 KVA Approved load of Electricity
- Power back up: 1 X 400 KVA generators
- 20 KVA UPS for QC Labs
